People: Architect, IKM, Pittsburgh; contractor, Turner Construction, Pittsburgh; dealer and installer (Building 1), Kalkreuth Roofing and Sheet Metal, Wheeling, W.V.; dealer and installer (Buildings 2 and 3), A.C. Dellovade, Canonsburg, Pa.
Products: Moon Township, Pa.–based Centria manufactured the metal components used in the project. Building 1 of the complex uses 60,223 square feet of Formawall Dimension Series 2-inch horizontal panels in light gray with an embossed finish; 16,992 square feet of Formawall Dimension Series 2-inch horizontal panels in midnight bronze with fluorofinish coating; 15,002 square feet of Profile Series Exposed Fastener Profiles Super-Rib with MicroSeam corners and louvers in midnight bronze with fluorofinish coating; and 15,397 square feet of L2-3 Liner Panels in arctic ice with a polyester coating. Buildings 2 and 3 use 63,004 square feet of Formawall Dimension Series 2-inch horizontal panels in light gray with duracast coating; 19,241 square feet of Formawall Dimension Series 2-inch horizontal panels in midnight bronze with fluorofinish coating; 5,336 square feet of Profile Series Exposed Fastener Econolap 1/2-inch in midnight bronze with fluorofinish coating; and Profile Series Super-Rib Louvers.
Fine points: Westinghouse sought a timeless aesthetic with a modern feel. Metal panels were chosen to provide a contemporary look with an uninterrupted appearance. The three-building campus achieved LEED Certified status from the U.S. Green Building Council.